Bid Number:
022026-1019
Estimated Cost Range:
$1,351,000 to $1,601,000, plus Washington State Sales Tax (WSST)
Procurement Summary:
The Work required for this Project includes:
Eradicating an invasive snail species by removing its habitat through re-grading and filling the entire site with crushed surface top course. Work will also include installation of stormwater utilities and construction of a containment cell to cap an area on the site with existing contamination
Eradicating an invasive snail species by removing its habitat through re-grading and filling the entire site with crushed surface top course. Work will also include installation of stormwater utilities and construction of a containment cell to cap an area on the site with existing contamination
Contact:
Notes:
Pre-Bid & Site Visit NOT mandatory.
PA000000411
PA000000411
Bids Due:
Pre-Bid Conference and Site Tour:
Questions Due:
Documents:
022026-1019_manual.pdf
(178.36 MB)
022026-1019_drawings.pdf
(83.11 MB)
022026-1019_addendum_no._01.pdf
(16.41 MB)
022026-1019_q_and_a_01.pdf
(115.79 KB)
022026-1019_preliminary_bid_results.pdf
(117.58 KB)
022026-1019_bid_tab.pdf
(99.01 KB)
tucci_bid.pdf
(458.17 KB)
nordland_bid.pdf
(1 MB)
nw_construction_bid.pdf
(562.45 KB)
nw_cascade_bid-nr.pdf
(668.19 KB)
road_const_nw_bid.pdf
(454.22 KB)
pivetta_brothers_bid.pdf
(607.02 KB)
022026-1019_holders_list_7-22-26.pdf
(91.84 KB)